Stafford High Street

Project Details

Client: McPhillips

Service Provided: High Street Pressure Wash

Contract Value: £20,000

Completion Date: Jan 2025

 

Project Overview

Between November and January 2025, we were appointed by McPhillips to carry out extensive external cleaning works along Brierley Hill High Street.

As a busy commercial area with constant pedestrian movement and active businesses, maintaining cleanliness while ensuring public safety required detailed planning and a flexible approach. The objective was to restore the appearance of the high street through comprehensive pressure washing and full chewing gum removal.

Our Scope of Works

The programme of works included:

  • Pressure washing of footpaths and paved areas
  • Steam-based gum removal using a low-flow, high-temperature mobile unit
  • Implementation of footpath closures with coned-off working zones
  • Installation of clearly signed and arrowed pedestrian diversion routes
  • Safe vehicle positioning within lined bays where possible, with additional coning where required

This ensured a thorough clean while maintaining safe public access throughout the project.

Methods & Approach

Given the high footfall and trading activity along the high street, works were carefully phased to minimise disruption to businesses and pedestrians. Footpaths were coned off in controlled sections, with safe alternative routes clearly marked. In higher-risk areas, staff were positioned to guide members of the public safely through designated walkways.

Our specialist low-flow, high-temperature chewing gum removal unit allowed us to lift stubborn deposits effectively without oversaturating the paving. Pressure washing was carried out methodically to remove surface dirt and staining while protecting the integrity of the slabs.

Project Outcome

The completion of the works significantly improved the overall appearance of Brierley Hill High Street. Chewing gum deposits were removed in full, paving was refreshed, and the environment was left cleaner and more presentable for businesses, residents and visitors.

Through careful planning, traffic management and flexible scheduling, the project was delivered safely and efficiently, supporting the ongoing upkeep of this busy town centre location.